| ❑ | Hinweis: Versichern Sie sich, dass Sie die Einstellungen zur Beurteilung (Pegel runden, Pegel grösser/gleich oder grösser) korrekt vorgenommen haben. Seien Sie sich über die Praxis der Beurteilung des jeweiligen Projektes im Vollzug bewusst (Grenzwert erreicht oder überschritten). |
| ❑ | Anmerkung: When using colors and patterns for a comparison-selection to present the difference between two immission-selections on a building, the 2D-viewer shows the "overall" presentation of the building (based on a building-level evaluation). To prepare this presentation, SLIP first evaluates the building for the first selection by taking the max. immission over all receivers assigned to the building (within the specified max. xy-distance). Then, it does the same for the second selection. Finally, it calculates the difference between the two obtained values. Shortly, it first takes the max. immission (for each of the two selections) and then it calculates the difference between these two maxima; in symbols, the used operation is The analogous is performed to obtain a floorwise presentation (which can be seen in the 3D-viewer (only when this viewer is not in draft-mode), but with only the receivers at each given floor being assigned to it. Btw, the 3D-viewer shows the building-level presentation color for the roof (not in draft-mode). |
| ❑ | Hinweise:
|